Universal Style Euro V Euro VI Exhaust Muffler Auto Spare Parts Catalytic Converter for All Car Style

1. 409L /304 stainless steel

2.  Ceramic / metallic substrate

3. Strict quality control during the process

4. OEM designed

5. 24 months warrantee

6. Competitive price ,delivery on time and after-sale service


Product Detail

Product Tags

Our Advantages

Our Advantages

1.  High-quality coating.

2.  Can depend client's design the shape and size.

3.  Higher gas purification effect

4.  Good against catalyst poisoning performance and useful life

5.  Polishing and etching are available.

6.  Up to Euro VI Emission Standard.

How to order

(1)You send us drawing or sample;

(2)We carry through project assessment;

(3)We give you a design;

(4)You think the design is ok;

(5)We make the sample and send it to you.

(6)You think the sample is good then place an order and pay us a 30% deposit;

(7)We start to make the product;

(8)When the goods are done, we deliver them to Shengzhen Yiantian;(9)You pay us the balance after you see the B/L Copy;

(10)The whole order is done, thank you!

Parameters

Product name Universal three way  catalytic converter
Model Number DJN0433
Brand Name DJN
Emission Standard: EURO 2/3/4/5
OE NO.
Year:
Car Fitment: Universal three way  catalytic converter
Overall length (mm) 14.17''/359.918mm
Inlet/outlet Diameter (mm) 1.75''/2''/2.25''/44.45mm/50.8mm/57.15mm
Material Inside : ceramic(honeycomb) substrate 400cpsi with mat
Shell :304 or 409 # stainless steel shell,stainless steel pipe
Oxygen sensor ports NO
cpsi 400 /600/800
Wall thickness 0.09±0.025
Warranty 30000 miles performance/2 years
Packaging: Air bubble film and Carton Packing
MOQ: 50 pcs
Supply Ability 1000 Piece/Pieces per Week
Place of Origin: Jiangsu 
SAMPLE ORDER: Accept 
Condition new 
Function reduce harmful emission (CO,HC,NO) from motor vehicle Over 95% conversion efficiency;
Service Customers' specific demands available, design drawings are welcomed. OEM service is accepted
Supply Ability 1000 Piece/Pieces per Month
Packaging & delivery Air bubble film and Carton Packing, inside fix the product decently with expanded material
Port Shanghai/Ningbo
Lead time: 10-30 days .
Active catalyst ingredients Pt, Pd, Rh, and rare earth elements
Shape round, oval, race track

 

图片1(1)
U1c354584fa3945f092f9a30c8f351d014.jpg_960x960(1)
H10b62004da8544a68b27da5442573f8bC.jpg_960x960(1)
Hee2f2494c38f4326852f28f26d11d3924.jpg_960x960(1)
H7a3945290e884fb3b2b6b38f33071ba0m.jpg_960x960(1)
He19c1ed607f44709a08ae4bddf61c2ccu.png_960x960(1)
4b619a2e607b28eb7ae3c838c5cf822
ec597db5454f3767c3fda374307c813
8b03d1003cc9f2d8f4c6e70929576b5
1b5f8dae026298d612cea4a74037ed6

  • Previous:
  • Next:

  • Write your message here and send it to us